The reconditioning of the State Highway 82 – Section I is part of a series of comprehensive improvements planned by the Provincial Road Department to be carried out over the entire Highway.
The total length of the works is about 1200m with lanes of 7.0m of width.
The following tasks were performed:
- Demolitions
- Earthworks
- Asphalt concrete and concrete pavements
- Infrastructure
- Culver and irrigation Canals
- Horizontal and vertical signage
- Street lighting and transfer of services
- Sidewalks and bike lanes